Future Development — 12–24 Month Outlook
- Liquid-Cooled Buildouts: Campus-level warm-water loops and CDUs to support dense GPU racks.
- Energy-as-a-Service: Dual-lease structures combining power and compute capacity.
- Tenant Pipeline: Hyperscalers, GPU cloud, national labs and defense seeking renewable-heavy capacity.
- Optical-Ready Designs: Preparing for co-packaged optics and optical I/O fabrics in AI clusters.
- Structured Finance: Green bonds and infrastructure funds to support campus expansion.
This outlook is an analytical forecast based on AI/HPC power-infrastructure trends; it is not company guidance.